Mon–Sat 7am–7pm · 24/7 emergency line

Licensed & insured in Colorado · Lic. MP 1048

The job file

Before and after photos from recent jobs, with the ticket that went with each one. Taken by the tech on site and signed off the same day.

Finished bathroom refit with a glass shower, marble tile and a new toilet

Photos

Taken by the tech on site

Warranty

12 months on every job

Sign-off

Customer keeps the pink copy

Filed

Newest first

Signed off

Finished bathroom refit with a glass shower, marble tile and a new toilet

Photos

Taken by the tech on site

Warranty

12 months on every job

Sign-off

Customer keeps the pink copy

Filed

Newest first

Signed off

Before: tankless swap in a 1962 ranch

Before

After: tankless swap in a 1962 ranch

After

Job file

No. 004118

Tankless swap in a 1962 ranch

Rusted 40-gallon tank out, wall-hung tankless in, new gas line and venting to code.

Service

Water heaters

Time on site

1 day

Signed off

Before: main-line hydro-jet after root intrusion

Before

After: main-line hydro-jet after root intrusion

After

Job file

No. 004106

Main-line hydro-jet after root intrusion

Roots cleared from 60 feet of clay line. Camera video showed the joint we'll watch next year.

Service

Drain cleaning

Time on site

3 hours

Signed off

Before: 100 to 200-amp panel upgrade

Before

After: 100 to 200-amp panel upgrade

After

Job file

No. 004097

100 to 200-amp panel upgrade

Old fuse-era panel replaced to make room for a heat pump and an EV charger.

Service

Electrical repairs

Time on site

1 day

Signed off

Before: furnace and AC replacement

Before

After: furnace and AC replacement

After

Job file

No. 004088

Furnace and AC replacement

A 24-year-old furnace and condenser swapped for a matched high-efficiency system.

Service

AC & heating

Time on site

2 days

Signed off

Before: hall bath refit

Before

After: hall bath refit

After

Job file

No. 004071

Hall bath refit

Tub out, walk-in shower in, new vanity, tile floor and a quiet fan that actually vents outside.

Service

Bathroom remodels

Time on site

9 days

Signed off

Before: slab leak reroute

Before

After: slab leak reroute

After

Job file

No. 004063

Slab leak reroute

Hot line leaking under the slab. Rerouted through the attic instead of breaking the floor.

Service

Emergency plumbing

Time on site

1 day

Signed off

Dispatch is open

Need it fixed today?

Same-day windows across Denver. Book online in a minute, or call and talk to Lena in dispatch.

Two Brightside techs in red shirts servicing rooftop air-conditioning units

Same-day slots

Book by 2pm, fixed today

Dispatch is open

Need it fixed today?

Same-day windows across Denver. Book online in a minute, or call and talk to Lena in dispatch.

Two Brightside techs in red shirts servicing rooftop air-conditioning units

Same-day slots

Book by 2pm, fixed today

Dispatch is open

Need it fixed today?

Same-day windows across Denver. Book online in a minute, or call and talk to Lena in dispatch.

Two Brightside techs in red shirts servicing rooftop air-conditioning units

Same-day slots

Book by 2pm, fixed today

Create a free website with Framer, the website builder loved by startups, designers and agencies.